The 2,000-square-foot addition will be located directly south of the main entrance, adjacent to the east side of the existing hospital building.
There will be a private CT suite, technologist area, patient prep room, wait space, change room, washroom, and stretcher holding area.
The Siemens CT scanner order was issued on April 29th with the equipment expected to arrive as soon as the addition is ready to receive it.