The Lucknow Elevated Water Tower is complete.
The project ensures enhanced water storage capacity and the safe drinking water in town.
In a release, the township says the Investing in Canada Infrastructure Program provided the needed financial support for the project which came at a cost of $5.26 million with the grant covering a good chunk of it.
The water tower was commissioned on November 8th replacing the original steel standpipe built in 1931.